How to Set Up a GCC in Uttar Pradesh: Incentives, Eligibility and Steps

India Entry Playbook · State guide

Uttar Pradesh’s GCC Policy 2024 pairs land, stamp duty and capital subsidies with support for running costs, payroll and fresh local hiring, and pays more on payroll outside Gautam Buddha Nagar and Ghaziabad. This guide is for leadership teams of Indian or foreign companies planning a captive centre in the state, or expanding one already there.

PolicyUttar Pradesh Global Capability Centres (GCC) Policy 2024
In force5 years from 7 May 2025, or until amended or repealed
Run byInvest UP, through its Policy Implementation Unit
Apply throughNivesh Mitra and the Invest UP portal

Who qualifies

  • A captive unit fully owned and operated by an Indian or foreign parent, delivering functions such as IT, R&D, finance, HR, design, engineering, analytics or knowledge services.
  • Third party service providers, BPOs and KPOs serving multiple clients, staffing companies, pure sales entities and professional services firms are excluded, as are undertakings where government holds 50% or more of the share capital.
  • Level 1 GCC: capital investment of at least ₹15 crore (₹20 crore in Gautam Buddha Nagar and Ghaziabad), or at least 100 employees (200 in those two districts).
  • Advanced GCC: capital investment of at least ₹50 crore (₹75 crore in Gautam Buddha Nagar and Ghaziabad), or at least 300 employees (500 in those two districts).
  • Existing units qualify for expansion if they raise gross block by at least 25%, or raise on payroll headcount by 25% or 100 people, whichever is higher.
  • Units with at least 1,500 employees, investment above ₹250 crore excluding land, FDI of at least ₹50 crore, or a parent listed in the Fortune Global 500 and Fortune India 500 (the rules say either list) employing at least 1,000 people, can seek a customised package from the Cabinet.

What you can claim

SupportWhat the state paysLimitPeriod
Land subsidy30%, 40% or 50% of the price of land allotted by a state or government agency, depending on regionNo cap stated; not available in rented or coworking spaceUp front, at allotment
Stamp duty100% remission of stamp duty on purchase or lease of land, office premises or buildings for the projectNo cap stated; needs a bank guarantee equal to the remissionFrom the stamp duty notification of April 2026 until the end of the policy period
Capital subsidy25% of verified eligible capital investment, including building, IT hardware, software and utilities₹10 crore (Level 1) or ₹25 crore (Advanced) in total. The implementation rules call these yearly caps, but the notified policy, which prevails, sets them as overall limits.7 equal annual instalments after commercial operations
Operating expenditure subsidy20% of lease rent, bandwidth from licensed providers, data centre or cloud costs from UP based providers, and electricity bills. Rent counts up to ₹50 per sq ft of carpet area a month.₹40 crore a year (Level 1) or ₹80 crore a year (Advanced)5 years from commercial operations
Payroll subsidy, Gautam Buddha Nagar and Ghaziabad35%, 30% and 25% of salary (basic plus DA) in years one, two and three, for UP domiciled employees and for women, SC, ST, transgender and disabled employees with a year of continuous service₹5 lakh, ₹4 lakh and ₹3 lakh per employee; ₹10 crore a year (Level 1) or ₹20 crore (Advanced) per unit3 years
Payroll subsidy, rest of UP50%, 40%, 30% and 25% of salary (basic plus DA) in years one to four, for UP domiciled employees and for women, SC, ST, transgender and disabled employees with a year of continuous service₹7 lakh, ₹6 lakh, ₹5 lakh and ₹4 lakh per employee; ₹12 crore a year (Level 1) or ₹25 crore a year (Advanced) per unit4 years
Interest subsidy5% a year or the actual interest paid, whichever is lower, on term loans for construction, equipment and site infrastructure₹1 crore a year5 years from commercial operations
Fresher recruitment subsidy₹20,000 for each new UP domiciled fresher who graduated from a recognised UP institution, for units recruiting at least 30 new UP resident employees a year₹5 crore per unitUp to 5 years from commercial operations
EPF reimbursementThe employer’s EPF contribution for UP domiciled employees and for women, SC, ST, transgender and disabled employees, at up to ₹2,000 per employee a month (the documents do not make clear if this is a ceiling or a flat amount)₹1 crore a year3 years from commercial operations

You cannot combine this policy with other UP state policies, though central government schemes can be added. If you take the land subsidy, land drops out of your eligible capital investment, and units in rented or coworking space cannot count land or building cost at all.

Where to set up

The state splits into three bands. Gautam Buddha Nagar and Ghaziabad have higher entry thresholds, a 30% land subsidy and a three year payroll subsidy with lower rates. The rest of Paschimanchal and Madhyanchal get a 40% land subsidy, while Purvanchal and Bundelkhand get 50%; both bands get the four year payroll subsidy at the higher rates. The policy documents do not list the districts in each region, so confirm your district’s band with Invest UP.

How to apply, step by step

  1. Apply online. Submit the prescribed application through Nivesh Mitra or the Invest UP portal, or by email, with a DPR certified by a third party CA or auditor, an investment intent letter and board resolution, land or lease proof, PAN, GST, CIN and EPF registrations, three years of audited financials where applicable, and Formats 1 to 5.
  2. Get an acknowledgement. A Technical Study Group at Invest UP runs a preliminary check, and on its recommendation the CEO of Invest UP issues an Acknowledgement Certificate within 30 days.
  3. Detailed evaluation. The Policy Implementation Unit assesses eligibility in detail and sends a recommendation to the Evaluation Committee chaired by the CEO of Invest UP.
  4. Final approval. For a Level 1 GCC, the Empowered Committee chaired by the Infrastructure and Industrial Development Commissioner recommends and the Minister of Industrial Development approves. Advanced GCCs and customised packages go through the High Level Empowered Committee headed by the Chief Secretary, then the Cabinet.
  5. Claim each year. The Letter of Comfort and every disbursement application follow the same route, and disbursements are processed annually.
  6. Keep reporting. Submit annual audited financials, quarterly employment reports and progress reports on investment, IPR and R&D. Expect periodic audits and physical verification.

Before you apply

  • For the stamp duty remission, arrange an irrevocable bank guarantee equal to the remission, valid for at least a year beyond your eligible investment period, and have the deed confirmed by the District Magistrate or the Deputy Commissioner of Industries.
  • Your investment window runs from the cut off date for up to 3 years (Level 1) or 5 years (Advanced), and ends earlier if you start commercial operations first. If you do not start operations within it, every incentive paid is recovered with 12% interest.
  • If your investment began before 7 May 2025, at least 80% of it must be made after that date.
  • In shared or leased premises, install a dedicated electricity sub meter and get monthly consumption certified by the developer to claim power costs.
  • Payroll and EPF support count only employees domiciled in Uttar Pradesh, or women, SC, ST, transgender or disabled employees. The documents do not say whether the ₹1 lakh salary test is monthly or yearly, so confirm it with Invest UP before you budget.
  • Employees working from home in UP count towards employment linked subsidies.

See what your centre could get. Our GCC incentive calculator compares Uttar Pradesh with every other state using your own headcount and investment.

Read the full Uttar Pradesh GCC profile for the latest announcements and centres, or start with our India GCC setup playbook.

Guides for other states

Have more information, data or an official update on Uttar Pradesh, or spotted something to correct? Send it to our editors.

Last reviewed on 6 November 2026. The Uttar Pradesh government sets the final incentives when it approves each project, and the policy itself can be revised.

The Narrative Republic is an independent business media platform dedicated to telling the story of foreign companies operating, investing, and growing in India. Through news, analysis, and executive insights, we explore how global businesses are shaping India’s economic future.

Reach Us

The Narrative Republic

Dedicated to one story: the narrative of foreign companies in India

For editorial inquiries, partnerships and research engagement: editorial@thenarrativerepublic.com

© 2026 The Narrative Republic.